{"id":33106,"date":"2022-03-15T11:35:53","date_gmt":"2022-03-15T10:35:53","guid":{"rendered":"http:\/\/www.vestec.cz.uvirt131.active24.cz\/?p=33106"},"modified":"2022-04-03T22:08:32","modified_gmt":"2022-04-03T20:08:32","slug":"rekonstrukce-ulice-k-hrncirum-mezi-seberovem-a-hrnciri-spojena-s-omezenim-provozu","status":"publish","type":"post","link":"https:\/\/vestec.cz\/en\/rekonstrukce-ulice-k-hrncirum-mezi-seberovem-a-hrnciri-spojena-s-omezenim-provozu\/","title":{"rendered":"Reconstruction of K Hrn\u010d\u00ed\u0159\u016fm Street in \u0160eberovo will start on 25.3.2022"},"content":{"rendered":"<p><strong>Due to the delay in the processing of the traffic engineering measure, the 1st stage associated with the traffic closure outside public transport will not start until 25 March 2022. It should be completed probably at the beginning of June 2022.<\/strong><\/p>\n<p>The municipal district of Prague \u0160eberov informs about the 1st stage of traffic restriction in the section between the Jord\u00e1nek pond in \u0160eberov and Ov\u010d\u00edn in Hrn\u010d\u00ed\u0159\u00ed (Hrn\u010d\u00ed\u0159sk\u00fd h\u0159ov cemetery), during which the traffic to this location will be <strong>only construction vehicles and BUS public transport are allowed to pass.<\/strong> All bus stops between \u0160eberov and Hrn\u010d\u00ed\u0159i will be in operation without restrictions. Other traffic will be routed in both directions along the detour route via K Labe\u0161k\u00e1m, Kunratick\u00e1 spojka and Na Jelen\u00e1ch. Access to the residential area in \u0160eberov and to businesses on the northern edge of Hrn\u010d\u00ed\u0159 will not be restricted. <a href=\"https:\/\/vestec.cz\/wp-content\/uploads\/2022\/03\/TV-Seberov.jpg\">Graphic illustration of the traffic restriction in Stage 1.<\/a><\/p>\n<p>More information can be found on the website of the municipal district of Prague \u0160eberov - <a href=\"http:\/\/www.seberov.cz\/news\/posileni-inzen%C3%BDrsk%C3%BDch-siti-a-rekonstrukce-ulice-k-hrncirum-mezi-seberovem-a-hrnciri-199671.htm\">Stage 1 of the traffic restriction<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Due to the delay in the processing of the traffic engineering measure, the 1st stage will be connected with a traffic closure<\/p>","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/posts\/33106"}],"collection":[{"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/comments?post=33106"}],"version-history":[{"count":9,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/posts\/33106\/revisions"}],"predecessor-version":[{"id":33247,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/posts\/33106\/revisions\/33247"}],"wp:attachment":[{"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/media?parent=33106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/categories?post=33106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vestec.cz\/en\/wp-json\/wp\/v2\/tags?post=33106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}